By far our biggest and most expensive project was the kitchen/bathroom. We removed all of the flooring in the kitchen, bathroom and hallway down to the subfloor. We replaced it with tile.

  1. We replaced the base cabinets.
  2. And then eventually the upper cabinets with 15" deep and 42" high cabinets to maximize storage.
  3. Finished off the porch from a 3-season to a fully insulated porch including adding lighting and electrical.
  4. Removed the slider from the porch to the kitchen.
  5. Removed the wall from the kitchen to the living room (support wall which required a carrying beam). This included moving some heating pipes.
  6. Moved the fridge to where the stove is/was and the stove to the where the fridge is/was.
  7. Added an over-the-range microwave.
  8. Added recessed lighting above the counter tops.
  9. Replaced the counter tops.
  10. Added a dishwasher.
  11. Replaced the ceiling fan.
  12. All new appliances (stove/range, refrigerator with water dispenser and ice maker).