This is the current wall that framed the coat closet. Its being removed to make way for the built in shelves and cubbies Mike is going to build.
Wall gone.
Child labor takes care of the clean up. There will be lots of dry wall patching and wall paper removal and then its time for this project to take shape. I hope to have it completed by baby time which is hopefully less than 8 weeks away!! But as long as the messy stuff is done before baby arrives ( think dry wall dust and saw dust) I will be content with that.
No comments:
Post a Comment